Sur: A neighbourhood of history, hope, and resistance

In this photo taken on Wednesday, Feb. 3, 2016, a family leave the Sur district in Diyarbakir, Turkey. The family are among tens of thousands displaced by fighting raging between Turkish security forces and militants in the southeast after a peace process collapsed in the summer. (AP Photo/Murat Bay)
A family leave the Sur district in Diyarbakir (Amed), Turkey, after heavy assault by the Turkish military. Source: AP Photo/Murat Bay.

by Eleanor Finley

Abdullah Demirbas was born in 1966 in the city of Diyarbakir (or Amed), Kurdistan. From 2004 until 2012, he served as mayor of Diyarbakir central Sur District, which has been largely destroyed in recent months by Turkish military assault.

While news of Sur’s destruction spread globally via social media, its profound cultural and historical significance is less widely known. For thousands of years, Diyarbakir has stood as the cosmopolitan heart of the Mesopotamian region. Sur is the city’s oldest neighborhood, with official records dating the city back over 3,000 years. However, local experts suggest that it is far older. Before its destruction, Sur was a lively and colorful place with narrow streets, cool shade, thick stone walls, narrow passageways, and luxuriant gardens. As a richly articulated living history, Sur shattered the stereotype of the Middle East as intellectually backwards and culturally empty.

During his tenure, Demirbas led social and cultural projects to renew Sur and preserve not only its material and architectural legacy, but also the livelihood and culture of its inhabitants. He helped establish the Council of Forty, a multi-faith forum across Amed’s religious communities, as well as a civil monument to the Armenian genocide, the only one of its kind in Turkey 1. In 2012, Demirbas was forcibly removed from office and arrested for using the Kurdish language in a municipal proceeding. Earlier this year, he relocated from Amed to Istanbul, where he teaches philosophy and politics in a local public school.

In the following interview, Demirbas and I discuss the history of Sur, as well as the recent waves of state violence, repression and the threat of civil war in Turkey. This was conducted remotely over two sessions and with the help of a translator. The text is edited in some places for length and clarity.

Can you tell me about Amed before 2004? 

When we (the BDP) took over in 2004, Amed was not in very good shape. It was actually a devastated, abused place. But during those ten years time, we did much restoration of churches, mosques, and synagogues for example; including an Alevi mosque and a Yazidi temple. We made plans to preserve Sur as a whole, which had never been done by any previous governments or mayoralties. Our plan was to rebuild Sur as it was before the 1930’s, with close resemblance to the original. As part of this merging of Diyarbakir’s many cultural roots, we also constructed multicultural institutions.

While we were doing all of this planning and reconstruction, we also paid close attention to our own democratic values and made sure that people were joining in and giving their opinions on these issues. We asked the people, we asked the NGOs, as well as the architects’ chambers and stakeholders in related fields. So we went to the Council of 40, and we made the plans in full consultation with them.

Say more about the Council of Forty? This is a religious council?  

Yes, that’s right. This is a unique council in Turkey. Gender equality and ethnic and religious equality are its ruling principles: so there are Armenian, Syrian, Kaldani, Alevi, even Turkmen representatives among its different contesting views. If we have to summarize, we were trying to make Sur reflect its own historical roots, because it is estimated that Sur is historically over eight or nine thousand years old and that over thirty-three different cultures have thrived there. Sur is the largest part of Diyarbakir, making Diyarbakir a multi-cultural, multi-identity, and multi-vocal city. But this remarkable diversity was denied at the foundation of the Turkish Republic, which consists only of a single nation, with a single language, and a single religion. So we wanted to rehabilitate all of these diverse fragments which have been under the shadow of destruction and keep them alive for the future.

It is estimated that Sur is historically over eight or nine thousand years old and that over thirty-three different cultures have thrived there, making Diyarbakir a multi-cultural, multi-identity, and multi-vocal city. But this remarkable diversity was denied at the foundation of the Turkish Republic.

The philosophical aspect to this is the belief that the world is a flower garden; and that there are different flowers, different colors, different shapes; that we have to “live and let live” in that world. That’s our perspective, and we wanted to make it a reality. We also wanted to give a model of peace to the Middle East, because the Middle East is constructed of different linguistic, religious, and racial groups. We plan to make Diyarbakir, and especially Sur, the center of Middle Eastern peacemaking.

How did the monument to the Armenian Genocide come about?  

We constructed a monument marking the genocide for the first time ever in Turkey, in 2013. In our opening speech, we declared that we are sharing in the pain of the genocide, to ensure that it won’t be lived ever again. In order to rule, the Turkish state has pushed different religions and different ethnicities one against the other, in an approach based on divide and conquer. However, our view is that there have been mistakes in the past, and we have to face up to these mistakes, apologize for them, and look forwards together.

We know that some of our ancestors, Kurds, during the Armenian genocide, were used as tools in these massacres by the Turkish state. We apologized by constructing this monument, and we asked the Turkish state to apologize to Christians, Armenian Christians, Assyrian Christians, Yezidi Kurds, Jews and Alevi, and also Muslim Kurds as well. If we can face the past correctly together, we can face a true future together, and we can live together. That’s the reason why we built the genocide monument.

How did the municipality address the liberation of women? 

For the first time in Turkey, we introduced female management and a Council of Women as well within the municipality. As we say, women are half of life, so we want to have women joining in life in their freedom. Because women are half the population, we want them to take their rightful place.

For the first time in Turkey, we introduced female management and a Council of Women as well within the municipality. As we say, women are half of life, so we want to have women joining in life in their freedom.

While I was running the administration of Sur, in 2005, we made a decision that if a worker of the municipality is abusing his wife, the city will cut the salary of the man, giving that sum directly to the female partner. If he then continues to abuse his wife, we asked him to vacate the job, replacing him in that post with his wife. If the man has two wives, we fire him and give the position to the first wife. We also gave salary bonuses to parents who educated their daughters in school.

We believe that in order to fully achieve women’s freedom, they must also have their own economic freedom, so we launched projects that brought women into the labour force. One of these projects is the Tandoori house project. In houses constructed by the municipality, women were making Tandoor bread, and they were making a living selling this bread to the market and shops. We also promoted the cultivation of tomato, peppers, and eggplants on the rooftops of people’s houses, where women could harvest them once they were dried in the summertime. We did this in order to introduce a system of organic agriculture, using the original seeds of these products as the basis for a seeding program.

Some of the thousands of people fleeing the historic Sur district of the mainly-Kurdish city of Diyarbakir, Turkey, Wednesday, Jan. 27, 2016, after authorities, fighting Kurdish militants there, expanded a 24-hour curfew to include five more neighborhoods. The curfew in Sur, in place since December, was enlarged on Wednesday to enable the security forces to "restore public order" in neighborhoods where militants linked to the Kurdistan Workers' Party, or PKK, had allegedly dug trenches, set up barricades and explosive devices. Turkey's military said three security force members were killed in an attack in Sur on Wednesday while the Dogan news agency reported heavy fighting in the neighborhood. (AP Photo/Murat Bay)
Some of the thousands of people fleeing the historic Sur district of the mainly-Kurdish city of Diyarbakir, Turkey, Wednesday, Jan. 27, 2016, after authorities expanded the curfew to include five more neighbourhoods to “restore public order” in neighborhoods where militants linked to the Kurdistan Workers’ Party, or PKK, had allegedly dug trenches and set up barricades and explosive devices. (AP Photo/Murat Bay)

What is happening now in the war that is raging in Turkey?

The ‘peace process’ came to an abrupt end last April, and as a result there is a huge conflict going on right now. Turkey is on the verge of civil war. Erdogan plans to be not only president but sultan in Turkey, and because the HDP (Peoples’ Democratic Party) 2 crossed the election threshold on June 7, this impeded Erdogan’s path toward the presidency and the sultanate. So he began a war of vengeance. The bombing of the Diyarbakir meeting just before the June election, the bombing of Suruj, and the murder of the two (Turkish) police officers, these were the triggers of the war. Because there were no third-party observers, the two sides do not trust each other and a civil war has broken out in the streets.

But we are now discussing the answer more than the question, and it is worth talking about the question. This is the century-old Kurdish question and the whole challenge for democracy in Turkey. The government’s main strategy for Sunnizing the country, for creating a Sunni Muslim state, depends on expanding the war. Because of his dream of dictatorship, Erdogan has started a civil war.

But we are now discussing the answer more than the question, and it is worth talking about the question. This is the century-old Kurdish question and the whole challenge for democracy in Turkey. The government’s main strategy for Sunnizing the country, for creating a Sunni Muslim state, depends on expanding the war. Because of these dreams of dictatorship, they have inflicted great suffering on the people, on society and the environment. Already, over 300,000 people have had to relocate. Most of the cities’ structures and infrastructure have been destroyed. In Cizre and Diyarbakir, many world heritage sites have been totally demolished. The socio-economic balance, which was already very out of kilter, has been totally upended again. We can sum up: that because of his dream of dictatorship, Erdogan has started a civil war.

Did the PKK set out to break with the peace process and what role did Abdullah Ocalan play in the ensuing conflict?

From the beginning, because there was no third party observer, neither party trusted the other. Now that the process seeking a solution has not only unravelled but become an “un-solution” process, the PKK has increased its attacks and its violence.

Mr. Ocalan has been in solitary confinement since April 2015, such that not even his lawyers can visit him. So he’s out of the picture. And this is one reason for the violence, because he cannot intervene to stop it in its tracks. When Mr. Ocalan was included in the negotiations, all of the violence was stopped. When the Turkish state ceased meetings with him, and isolated him, violence with the state increased. We might well conclude that if he were still involved in the solution process, this violence would not have happened. So it is our wish to see him involved in this process again.

How do the EU and US regard this isolation of Öcalan?

Currently they have not objected to it other than very feebly. Because of public pressure, the CPT delegation (the Committee for the Prevention of Torture, Council of Europe) met with him at the end of April, but there has been no press announcement to that effect so far. And they only went to see his conditions, not to involve him once again in the peace process.

The US has not acted as a mediator in this process, yet the US is the only actor who can be effective in this role. The US should step forward, because the development of peace and democracy in Turkey will initiate stability in the Middle East region as a whole, and things will go much better for the different ethnicities and beliefs trying to live together in harmony in the Middle East.

The Kurds and Mr. Ocalan advocate diversity and multiculturalism, multi-racialism, multi-religious-ism, and real secularisim. But the current state in Turkey is radically Islamicized and Turkified. They have supported at various times, ISIS, Al Qaeda, and other Islamic extremist groups. This scares the Shia, Armenians, Jews, Christians, and Alevi, who only number 600 of those who are left, as well as other ethnic and religious minorities, because the current Turkish state does not tolerate difference. So our wish is that the EU and US should pressure Turkey into restarting the peace process again.

For the past century, Turkey has had this problem. And the reason for this is Turkey’s official ideology, which holds that everybody in Turkey is a Turk; their language is Turkish, their culture is Turkish, and they are all Sunni Muslim, so that all cultural and racial and religious differences must be obliterated. In the last period of the Ottoman Empire, even Iranians and Assyrians were targets of genocide. After that, in the Republic, they started on Kurds in Dersim and the Republic of Agur, because these were the people who were rejecting this monocultural, unitarian identity. They had to be destroyed, even without any open rebellion, just because they declared that they were not the same. None of these problems have ever been solved.

In your view, what is the solution to the current situation?

First of all, we should have a new constitution which is liberal, democratic, and for universal civil rights in Turkey. In this constitution, all the different ethnic and religious and gender-based differences should be accommodated. Everybody should have the right to be educated in their mother language. All the religions and beliefs in Turkey should have the right to be represented openly. The protectorate system, which is only deployed in Kurdistan, should be abolished, and the state should face up to its past, its bloody history, and apologize to the Armenians, Assyrians, Greeks, Kurds, Jews and Yazidi, as well as the Alevi Turks. In fact, such a new constitution would also be seen as meeting the EU’s constitutional demands.

We ask the intellectual community, academicians, and the whole of international public opinion to pressure Turkey both institutionally and culturally to stop this violent process and return to peace. .

The final thing to say is that we ask the intellectual community, academicians, and the whole of international public opinion to pressure Turkey both institutionally and culturally to stop this violent process and return to peace. We invite them to support our policies of environmentalism and gender and sexual equality, because it is our firm belief that especially female independence is the main bulwark of freedom in society. Moreover, multilingualism should find favor in every state.

Eleanor Finley is a board member of the Institute for Social Ecology. She has a background in feminist activism and was a participant in the Occupy Wall Street Movement. Eleanor is a graduate student in anthropology at the University of Massachusetts, Amherst, where her research focuses on social movements, environment, and energy in Europe. She is currently conducting action-research within the Spanish anti-fracking movement, and interns with Environmental Justice Organizations, Liabilities and Trade (EJOLT) at the Autonomous University of Barcelona.

This article was originally posted on openDemocracy.

To receive our next article by email, click here.

Hydro power projects as a resource curse

Indian Buddhist monks and nuns attend a special prayer session 'Avalokesteshvara Initiation' with Tibetan spiritual leader the Dalai Lama at Yid-Gha-Choezin in Tawang, in the northwestern corner of Arunachal Pradesh state, on November 10, 2009. The Dalai Lama held a mass audience with tens of thousands of devotees on a "non-political" visit to a region near India's border with Tibet that has drawn shrill protests from China. AFP PHOTO/Diptendu DUTTA (Photo credit should read DIPTENDU DUTTA/AFP/Getty Images)
Indian Buddhist monks and nuns attend a prayer session with Tibetan spiritual leader the Dalai Lama in Tawang, in the northwestern corner of Arunachal Pradesh state, on November 10, 2009.  Source: AFP PHOTO/Diptendu Dutta.

by Soumik Dutta

On May 2nd, 2016, two people, including a Buddhist monk, were killed when police fired at a crowd of protestors in India’s Arunachal Pradesh state bordering China—injuring ten others. The protest was sparked by the arrest of Lama Lobsang Gyatso, a monk active against mega power projects in the Tawang district.

Anti-dam protesters in Arunachal include various student bodies, environmental groups, and civil society organisations. This January, hundreds of Buddhist lamas joined protests in Tawang, a smaller district in the province, to say no to large dams in the ecologically, culturally and strategically sensitive area. Various Indian national level media outlets reported the Tawang protests, and people’s Facebook news feeds were abuzz with the Tawang firing.

At the root of the protests are changes to India’s energy policies, said to be crucial for the country’s economic development. India’s National Hydro Power Policy of 2008 had identified a total capacity potential of 1, 48,701 MW of hydropower in the country, of which 50,328 MW was in Arunachal Pradesh alone. Of these, the 2,000 MW Lower Subansiri hydro project 80% of the construction of which has been completed has been stuck since December 2012 following massive protests in downstream Assam.

At the root of the protests are changes to India’s energy policies, said to be crucial for the country’s economic development.

The Arunachal Pradesh government has signed several Memoranda of Understanding (MoUs) with various companies for over 100 big and small hydropower projects in the state, and 13 of these with a total installed capacity of 2791.90 Mega Watts (MW) are in Tawang. The abundance of rivers in the Himalayas and the nation’s ever-growing demand for power propelled the government of India to envision a national hydro power policy that would exploit the vast hydro power resources of Himalayan states like Sikkim, Himachal Pradesh, and Arunachal Pradesh.

Energy is crucial to the economic development needs of every nation. Hydro power, which was considered clean energy with very negligible impact, has however turned out to be quite the opposite. Often, projects have socio-cultural impacts on communities dependent on the river and often have disastrous environmental results. In many cases, the myth about hydropower being cleanest and safest is turning out to be untrue. Human lust for more economic development and the consequent need for more power has created a situation where water, the most abundant natural resource, has become a bane—a resource curse.

The Arunachal firing is a case in point. Many other states in India have witnessed similar protests and ruthless oppression by the government. In fact, when it comes to hydro power projects globally, a politician-corporate development nexus that results in the oppression of civil protests has become a common scenario. International organizations, politicians, investors, and developers are uniting to participate in the systematic plunder of the most abundant natural resource, water, in the garb of economic and sustainable development of nations.

 

Sustainable energy or environmental conflict?

Hydro power is often put forward as a clean, sustainable form of energy. In the case of India’s Himalayan states, there are both public and private benefits. Apart from the incentive of generating revenues from sale of hydro power, the certified carbon reductions (CERs) from the United Nations framework convention on climate change (UNFCCC), under the Clean Development Mechanism (CDM) has worked as a strong factor for both the private project developers and the government for pursuing hydro power projects.

But NGOs like the Save Mon Region Federation (SMRF) are of the opinion that these proposed and upcoming hydro power projects would adversely impact the fragile Eastern Himalayan ecosystem, which is also a seismically vulnerable zone that has experienced several major earthquakes over the past few decades.

protest
Source: SANDRP

On April 7th, in response to a petition filed in 2012 by the SMRF, the National Green Tribunal (NGT) suspended the environment clearance granted by the Indian environment ministry for the $64 billion Nyamjang Chhu hydropower project in Tawang’s Zemingthang area. The NGT asked for new impact assessment studies and public hearings for local people.

The NGT also noted that the project promoted by the steel conglomerate LNJ Bhilwara Group did not consider its impact on the habitat of the endangered black-necked crane, which is endemic to the region. The bird is rated “vulnerable” in the International Union for Conservation of Nature’s list of endangered species and is listed in schedule 1 in India’s Wildlife (Protection) Act of 1972.

The black-necked crane also has significant cultural value to communities in the region. “We connect it with the sixth Dalai Lama who was from Tawang,” said Lama Lobsang Gyatso, the general secretary of SMRF, speaking to Uneven Earth. “He wrote poems on the bird. Apart from local sentiments, the bird has been labelled endangered by law. The Bombay Natural History Society selected Zemingthang [an area within Tawang] as an important bird area for this reason.”

As a result of its activities, the SMRF became unpopular with the government, which branded it as anti-development, leading to the subsequent arrest of its leader and the police firing.

As a result of its activities, the SMRF became unpopular with the government, which branded it as anti-development, leading to the subsequent arrest of its leader and the police firing. Undaunted, after his release on bail, Gyatso’s SMRF, along with another NGO, 302 Action Committee, submitted a memorandum to the deputy commissioner of Tawang demanding a probe by central bureau of investigation(CBI) New Delhi into the May 2nd killing at Tawang. The state government had constituted a magisterial inquiry and suspended several police officers involved in the incident.

Gyatso and his associates reiterated that if CBI investigation into the incident is not done, they will resort to demonstrations in front of the United Nations office New Delhi, apart from protest rallies in Itanagar and Tawang.

delhi_dharna_06
Affected Citizens of Teesta raising awareness against the dam projects on the Teesta river in Sikkim, another northern state. Source: ACT.

Cultural genocide: Sacred Buddhist River in peril in Sikkim

Protests against hydro power projects across India are not new. In Sikkim, communities have been protesting against the Rathong Chu hydropower projects since the mid-nineties, when the Sikkim Democratic Front Party (SDF) government, under Chief Minister Pawan Chamling, had decided to go ahead with a proposed 30 MW hydropower project on the Rathong Chu river, despite tremendous pressure against it, mainly on religious grounds.

Rathong Chu is considered to be a ‘sacred’ river according to Neysol and Neyig Buddhist texts, the water of which is used even today for an annual Buddhist festival – Bum Chu, at the Tashiding Monastery. This has been an important Buddhist tradition since the time of the erstwhile Chogyals (Kings) of Sikkim from the Namgyal dynasty.

Eventually in 1997, under scathing criticism of infringement on cultural and religious rights of Buddhist minorities, the Chamling government decided to scrap the project. Ironically, the same Chamling-led SDF government allotted another project on the Rathong Chu river, a little further downstream, in the year 2006. In fact, the project capacity now was enhanced from 30 MW to 97 MW! While the earlier project was called the Rathong Chu HEP project, it was now rechristened the Tashiding Hydro Power Project.

“We will not stop until we are able to stop attacks on Buddhist religious sites in the name of development.” -Tseten Tashi Bhutia, of Sikkim Bhutia Lepcha Apex Committee.

But local groups continue to fight against these proposals. “We will not stop until we are able to stop attacks on Buddhist religious sites in the name of development”, said Tseten Tashi Bhutia of Sikkim Bhutia Lepcha Apex Committee (SIBLAC), an NGO fighting against the Tashiding and Panan projects, speaking to Uneven Earth.

As part of these protests, Sikkim witnessed the longest indefinite hunger strike in the province’s history. The action was called on 20 June 2007 by the Affected Citizens of Teesta (ACT), an NGO formed to fight the government’s decision to build seven large-scale hydroelectric projects within the ancestral lands of the indigenous Lepcha community. Although the Lepcha are also found in other parts of India and in Nepal, around 86 percent of their 9000-strong population resides in Dzongu.

The Dzongu area was traditionally known as Myal Lyang in Lepcha language or Beyul Demazong in Bhutia – the latter meaning ‘land of sacred and secret treasures’ and the former meaning, essentially, paradise. It was here that, according to legend, the Lepcha god created the first Lepcha man and woman from the sacred snow of the mighty Khangchendzonga (Kanchenjunga)—the world’s third highest peak, which the Bhutia and Lepcha revere to this day as a protective deity.

In fact, within the core area of the proposed Panan hydroelectric project (300 MW) are a host of sacred sites: the Kagey Lha-Tso Lake, the Drag Shingye caves, and the Jhe-Tsa-Tsu and Kong-Tsa-Tsu hot springs, which are said to be endowed with healing properties. Indeed, the entire northern district of Sikkim has numerous such ‘treasures’, each of which was blessed by Guru Rinpoche (Padmasambhava), the patron saint of Sikkim. Panan is one of the more disputed projects proposed for Dzongu – an area not only sacred but also falling dangerously close to the Khangchendzonga National Park, an area rich in flora and fauna.

slide-2
Source: Save The Teesta

The hydro bubble is bursting in India

Hydro-power projects are often proposed as a tool for profit generation, local economic development, and a renewable, sustainable source of energy generation. However, this win-win situation is turning out to be a nightmare of sorts with most of the ‘clean’ energy projects in these states failing to take off after several years of having signed the MoU with state governments. In many cases, the registration process they followed flouted the CDM norms, with project design documents often filled with blatant lies.

This is then coupled with delayed projects accruing huge debt—liability burdens which are being passed on to the respective states. After almost a decade of signing their MoUs, both the companies as well as the respective governments have accrued huge debt burdens due to inordinate delays in implementation with pretext after pretext—making many projects economically unviable due to the present day inflation and market rate of interest.

The returns on investments are bad, production cost high, and sale price of a unit of power low.

In the financial year 2015, India generated 1048.7 Billion Units (BU) of electricity, out of which only 133 BU was from the hydro power projects. Out of the 1048.7 BU electricity produced, 90% is sold through long-term power-purchase agreements, while the rest is traded on the short-term spot market. It is here that corporate power producers will have to make their profits.

But Sikkim, with an annual state budget of $315.86 million, has equity participation worth $230 million. Simply put, it took on huge debt to buy equity and with project delays and abandonment, leading to spiraling burdens that are then being passed on to the people. This has resulted in an absurd situation, where the production cost of one unit of electricity has become more costly than the sale price.

In March 2016, India’s ministry of power intervened to restore three stalled power projects in Sikkim; Panan (300 MW), Teesta VI (500 MW), and Rangit IV (120 MW) with total installed capacity of 920 MW. In a meeting held at New Delhi between the Sikkim government, the private developers of these projects, and the national hydro electric corporation of India (NHPC), Sikkim was asked to either incentivize the independent power producers, or cancel their MoUs after compensating them for investments in the projects.

The independent power producers are not keen on further investments, as breaking even will be impossible in the short term. The returns on investments are bad, production cost high, and sale price of a unit of power low.

 

The mega hydro power projects that fail

Hydro power projects all over the world are subject to widespread criticism for alleged human rights violations. Apart from the catastrophic environmental and geological disasters they trigger, they also resort to land acquisition—often forced—leading to displacement of people. These mega projects are most often imposed upon people in the garb of development; allowing a nexus of governments in collusion with corporate entities engage in this process of plunder. International funding agencies like the World Bank and private equity investors pump in huge quantities of money. Often, these companies or their front (shell) companies are based in tax haven countries and the money trail is obscure.

These mega projects are most often imposed upon people in the garb of development; allowing a nexus of governments in collusion with corporate entities engage in this process of plunder.

For example, in South America the Yacyretá Dam on the Parana River, which lies on the border between Argentina and Paraguay, generated controversy and criticism during its planning and construction, and is often referred to as a ‘monument to corruption’. While initially the construction costs of the dam were slated at $2.5 billion, eventually they escalated to $15 billion.

Environmental and social impacts run rampant. In China, the Three Gorges Dam project was held responsible by scientists and environmentalists for causing draughts in the upstream of Yangtze River and for increasing the frequency of landslides and earthquakes along areas next to the structure. The project also submerged a number of factories, mines and waste dumps, and a few industrial centres, which are alleged to have polluted the river. Biodiversity experts believe that the Three Gorges Dam has affected hundreds of animal and plant species in the Yangtze River and threatened the fisheries in the East China Sea.

Another glaring example would be in Brazil. Best known to the world for football and samba—and the upcoming Olympics, the country is now in the limelight for anti-dam protests against the Belo Monte Dam project which has been under construction since March 2011. The project, situated on the Xingu River in the state of Pará, faces fierce resistance from the Xingu’s Indigenous peoples and social movements, with support from international agencies.

With an expected 11,233 MW installed capacity, Belo Monte will be the world’s third biggest hydroelectric project when it starts full-fledged operation in 2019. The project was first proposed in 1975 but subsequently abandoned due to stiff opposition from environmental activists and local people. It was redesigned and revived in 2003, and received partial environmental license from the Federal Environmental Agency (IBAMA) in February 2010. The redesigned project, which is being constructed with an estimated investment of $13bn, is now battling at national and international tribunals against charges of displacing thousands of indigenous people and devastating over 1,500km2 of Brazilian rainforest in the Amazon basin.

In Tawang, hydro power projects have also failed to meet development promises by the government. While work on 13 hydro-electing projects in Tawang is currently going on, the government has planned a total of 28 mini- and micro-dams in the district. Even though the power requirement of the district is 6.5MW, if all these mini and micro projects were to produce the electricity as shown on paper, it would be more than 20MW. However, even after many of these projects were completed, they failed to produce adequate electricity, so much so that there are long hours of power cut even in Tawang’s sub-zero temperatures.

aapsu-candle-light-vigil-450x300
Source: Save Tawang

Conclusion

Development of every nation comes at a cost. The complex nexus and vested business interest of corporate groups, international funding agencies, private equity investors and powerful politicians have created a systematic plunder of natural resources, be it water or coal. However, development needs to be sustainable and not detrimental to the environment. The May 2nd killing in Tawang is a grim reminder to the policy makers that the development path chosen was fraught, to say the least. Globally, due to inflation, escalation of project costs and low returns on investments, many mega projects have failed to deliver as expectated, some have even failed to take off and too many have led to dissidence, socio-cultural rifts, and environmental disasters.

 

Soumik Dutta is a Graduate in Economics from Scottish Church College University of Kolkata, and a a freelance investigative journalist covering hydro power projects and protests by affected people, corruption of government and corporations, and environmental violation by infrastructure projects. He has published his stories in the likes of Outlook Magazine, Cobrapost, hundredreporters.org, and thirdpole.net. He loves travelling, music, reading, and good food.

To receive our next article by email, click here.